Meanwhile in winter wonderland…

Montreal’s been buried under a record amount of snow over the last week, and while we would have loved to head down south for a little R&R, this turned out to be the perfect week for a staycation. We’ve made some headway in the bathroom – the walls have been sanded, primed, and painted.

Bathroom Walls, painted

Only the exposed walls were painted. The ones left as-is will be entirely covered by tiles.

Bathroom Wall, Painted 2

The photos don’t really give the paint color justice, but the walls are a soft minty green color. Dewdrop by Benjamin Moore. The ceiling is Mountain Peak White by Benjamin Moore.

We’ve also installed the light fixtures, and now need to start tiling the floor, shower and bathtub areas. We’ve decided to preserve our energy and outsource the tiling job to a pro. We found a guy who’s not only affordable but also does excellent work. The downside is that…ermmmm…. he didn’t show up 2 days in a row as planned (supposedly due to the snowstorm). I had been warned in advance that he’s not 100% reliable, but given that he’s good at what he does, we’ve agreed to give him the benefit of the doubt and keep busy by starting the dining room renovation.

Dining Room, Before 1

Goodbye two-toned dining room with useless half walls!

Yesterday and this morning, I removed all of the original moldings, while Adam knocked down the ceiling and outdated half-walls separating the dining room from the living room. The plan is to leave some sort of separation between the two rooms, to allow for a different paint color in each room. I think I’m gonna go for dark and dramatic in the dining room, while keeping the living room light and airy.  The reason for removing the ceiling is a) to get rid of the 70s popcorn look, and b) to add strapping so that electrical wires can be easily fished through the ceiling to install potlights.

Dining Room, Moldings removed

Dining Room, sealed off

We completely sealed the entry to the kitchen to minimize dust in other rooms. The big NO sign is for Adam.

Adam, removing ceiling drywall

Clean up time

The carnage

Sadly, I must return to work tomorrow, but Adam’s still off for the rest of the week. His goal: add wood strapping to ceiling, prep electrical for pot-lights and hopefully also install new drywall. Who knows, maybe I’ll be able to get started with plastering by the time the weekend rolls around.

So that’s where we’re at. Oh, and I’ve been working on the nursery layout too – stay tuned for updates!

Ciao for now.

About these ads

2 thoughts on “Meanwhile in winter wonderland…

  1. Oh my, you guys have been really busy bees! Amazing work of course, I wish I could help. Nice painting job in the bathroom, and I can’t wait to see the tiles. I hope your tile guy won’t read the blog…..

  2. WOW your staycation turned into a workcation! It is really looking great! The big NO would also be for me… haha I would need the reminder not to walk through it… I am a creature of habit and don’t always think before I step. :) I like your idea of hiring a tiling guy and I plan on doing the same for the backsplash in the kitchen!! I always know when you are both quiet, you are working on the house!!! Love getting the reno updates… keep em coming!! xoxox

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s